PostgreSQL
15.1. How Parallel Query Works #
When the optimizer determines that parallel query is the fastest execution strategy for a particular query, it will create a query plan that includes a Gather or Gather Merge node. Here is a simple example:
EXPLAIN SELECT * FROM pgbench_accounts WHERE filler LIKE '%x%';
QUERY PLAN
-------------------------------------------------------------------------------------
Gather (cost=1000.00..217018.43 rows=1 width=97)
Workers Planned: 2
-> Parallel Seq Scan on pgbench_accounts (cost=0.00..216018.33 rows=1 width=97)
Filter: (filler ~~ '%x%'::text)
(4 rows)
In all cases, the Gather
or Gather Merge
node will have exactly one child plan, which is the portion of the plan that will be executed in parallel. If the Gather
or Gather Merge
node is at the very top of the plan tree, then the entire query will execute in parallel. If it is somewhere else in the plan tree, then only the portion of the plan below it will run in parallel. In the example above, the query accesses only one table, so there is only one plan node other than the Gather
node itself; since that plan node is a child of the Gather
node, it will run in parallel.
Using EXPLAIN, you can see the number of workers chosen by the planner. When the Gather
node is reached during query execution, the process that is implementing the user’s session will request a number of background worker processes equal to the number of workers chosen by the planner. The number of background workers that the planner will consider using is limited to at most max_parallel_workers_per_gather. The total number of background workers that can exist at any one time is limited by both max_worker_processes and max_parallel_workers. Therefore, it is possible for a parallel query to run with fewer workers than planned, or even with no workers at all. The optimal plan may depend on the number of workers that are available, so this can result in poor query performance. If this occurrence is frequent, consider increasing max_worker_processes
and max_parallel_workers
so that more workers can be run simultaneously or alternatively reducing max_parallel_workers_per_gather
so that the planner requests fewer workers.
Every background worker process that is successfully started for a given parallel query will execute the parallel portion of the plan. The leader will also execute that portion of the plan, but it has an additional responsibility: it must also read all of the tuples generated by the workers. When the parallel portion of the plan generates only a small number of tuples, the leader will often behave very much like an additional worker, speeding up query execution. Conversely, when the parallel portion of the plan generates a large number of tuples, the leader may be almost entirely occupied with reading the tuples generated by the workers and performing any further processing steps that are required by plan nodes above the level of the Gather
node or Gather Merge
node. In such cases, the leader will do very little of the work of executing the parallel portion of the plan.
When the node at the top of the parallel portion of the plan is Gather Merge
rather than Gather
, it indicates that each process executing the parallel portion of the plan is producing tuples in sorted order, and that the leader is performing an order-preserving merge. In contrast, Gather
reads tuples from the workers in whatever order is convenient, destroying any sort order that may have existed.
Prev | Up | Next |
---|---|---|
Chapter 15. Parallel Query |
15.2. When Can Parallel Query Be Used? |
Submit correction
If you see anything in the documentation that is not correct, does not match your experience with the particular feature or requires further clarification, please use this form to report a documentation issue.
Copyright © 1996-2024 The PostgreSQL Global Development Group